M-018 Pullman Hotel, Albert Park
Últimos Boletines
  • 26th octubre 2022, 'Infinity Site Safety - Hazard Reports and Feedback, we want to hear from you'

    As we endeavor to continually improve the safety culture at Infinity, we would really like to hear from you!
    It takes all of us to establish and maintain a safe workplace and your voice is important.
    Please help us by communicating the following to all your site employees and encouraging them to provide feedback;

    All safety concerns, suggestions or indeed compliments should be communicated to the Site Manager. If that is impractical or simply not comfortable PLEASE use either the Hazard Report Form OHSF-010 available on site in lunch sheds or via the URL/QR Code available on site notices

    Please contact your relevant site manager with any queries.

    Many thanks for your attention to this,

    Catherine Vaughan
    Infinity Constructions
    WHSEQ & Systems Manager

Pronóstico del tiempo para la Obra
Tiempo en Obra actual

Última actualización el: 6:21 AM
Temperatura: 11C (Aplicación 11C)
Velocidad del viento: 0MPH
Máx. Viento: 4MPH @12:21 AM
Lluvia desde las 9 a.m.: 1.2mm
Temp mín: 10C @2:13 AM
Temp máx: 16C @2:54 PM 6/6/2026
Ráfaga: 0MPH
Ráfagas máx: 6MPH @12:21 AM


Observación obtenida de - Bureau of Meteorology
Lugar de observación - Melbourne (Olympic Park), VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - domingo, 7 junio

Partly cloudy.
Mín: 9C Máx: 17C
Probabilidad de lluvia: 10%


Pronóstico obtenido de - Bureau of Meteorology
Lugar de la previsión - Melbourne, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - lunes, 8 junio

Mostly sunny.
Mín: 10C Máx: 19C
Probabilidad de lluvia: 30%
Se esperan precipitaciones: 0 para 1mm


Documentos importantes de la Obra
  • 05. Safe Work Method Statement (For High Risk Construction Work) Template

    Subido 3/28/2025

    save_alt Descargar
  • IS-005 Construction Induction Card (White Card)

    Subido 9/26/2024

    save_alt Descargar
  • Young Worker Management Plan - example template

    Subido 10/9/2023

    save_alt Descargar
  • Safety Alert - 054 - Mobile Plant - Verification of Competency

    Subido 9/29/2022

    save_alt Descargar
  • 01. OHSF-086 Safe Work Method Statements (SWMS) for High Risk Construction Work (HRCW) Information Sheet.docx

    Subido 4/6/2022

    save_alt Descargar
  • Measuring Equipment & Calibration Requirements

    Subido 4/6/2022

    save_alt Descargar
¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

¿Primera vez en la Obra?

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro